info@getchbsrtk

THE GOVT. EMPLOYEES COOPERATIVE HOUSE BUILDING SOCIETY LTD. ROHTAK

Live Help

+91-9254325919

Live Help

+91-9254325919

gechbsrtk

Home

Contact Us

Home

gechbsrtk

About Us

Office Time

Infrastructure

ECO-Freindly

Facilities

Office Staff

Contact Us

Infrastructure

According to approved layout plan we have about 18 km. metalled rods connecting every nook & corner of the colony. Water works with OHSR with a capacity of 1 lac gallons, with well supplied water lines on one side of the road and sewerage drainage on the opposite side. Provision for storm water drainage has also been made.

Electricity supply to illuminate the future residential colony is by 33 K. V. substation along with its distribution system.

Infrastructure

According to approved layout plan we have about 18 km. metalled rods connecting every nook & corner of the colony. Water works with OHSR with a capacity of 1 lac gallons, with well supplied water lines on one side of the road and sewerage drainage on the opposite side. Provision for storm water drainage has also been made.

Electricity supply to illuminate the future residential colony is by 33 K. V. substation along with its distribution system.

About Us

Office Time

Infrastructure

ECO-Freindly

Facilities

Office Staff

Contact Us